Wednesday, July 18, 2007

2007.07.08 Optimizations

It was raining. So it's time for small jobs to do. First dropped few clamps and L pieces from the PCV system. Now it looks much simplier and reliable. From what I recall, I have made it so sophisticated just because had no apropriate length hose at that time...Next step was intake tract. Threw away 3b throttle body reducing piece, and put 76mm SS elbow with welded pipe for the ISV. Not very good looking, however does the job well:

Now car is ready for the track. Let's see what it will bring.

No comments: